PASMA Training Card

Prefabricated Access Suppliers' & Manufacturers' Association Ltd (PASMA)

web address; https://pasma.co.uk/

T: +44 (0) 345 230 4041


Personnel Protective Equipment (PPE)

Personnel Protective Equipment

Should be worn whenever work is being carried to protect the user from injury.

PPE is mandatory on all building and construction sites and responsibility is both contractors and operatives to ensure it is available and worn.

See: Health and safety


Polyvinyl Acetate (PVA)

Used as a binder in water based emulsion paints.

Also used as a  general glue for woodwork.


Principal Contractor

Principal/Nominated Contractor. Manages the construction of a project, liaising with the client and principal designer throughout the project, including during the pre-construction phase. See: https://www.citb.co.uk/documents/cdm%20regs/2015/cdm-2015-principal-contractors-printer-friendly.pdf


Principal Designer/ Archtitect

Principal Designers/Architect. Appointed by the client of projects with more than one contractor. Responsibilities include overall responsibility for planning, monitoring, coordination health and safety.

See: https://www.citb.co.uk/documents/cdm%20regs/2015/cdm-2015-principal-designers-printer-friendly.pdf


Quoin

Cast Quoin Stones are the stones which form the corners of a building.

 


Rebars

Metal rods for reinforcing concrete.


Risk Assessment

Risk Assessment

Risk assessments are to identify potential hazard when work of all natures are to carried out to safe guard not only the operatives but anyone who may come in contact within the work area.

See: H & Safety

https://www.hse.gov.uk/simple-health-safety/risk/index.htm  

 


Rust remover

Rust Remover.

Based on Phosphoric Acid for removing rust from metalwork.

 


Sand Paper

Graded sand particles onto a paper backing. Also Glass and Garnet paper.