ESK RISK ASSESSMENT
OPERATION/PROCESS
MANUAL HANDLING |
DATE:
|
No 3 | |||||
LOCATION
|
|||||||
EQUIPMENT USED
Ladders, step ladders, podiums, paint and materials |
CAN TASK BE ELIMINATED? | Yes
|
No
X |
||||
RISK PRIOR TO CONTROLS | |||||||
HAZARDS IDENTIFIED | Low | Med | High | ||||
Sprains & Strains and crushed limbs | X | ||||||
EXPOSED PERSONS
Site operatives |
TOTAL NUMBERS AFFECTED | ||||||
FREQUENCY OF EXPOSURE
Daily/Low |
DURATION OF EXPOSURE
Low/minimal over an 8 hour working day. |
||||||
CONTROL MEASURES ALREADY IN PLACE
1. Operatives are experienced in carrying paint and equipment on a regular basis as part of their daily work and are aware of the dangers of moving and lifting. Maximum lift of 10kgs 2. HSE information on manual handling provided to operative and regular toolbox talks 3. All operatives are told to seek assistance when carrying ladders, stepladders and podiums |
EXTENT TO WHICH THEY CONTROL RISK
1. Operatives are aware of correct lifting techniques. 2. Toolbox talks carried out to reiterate manual handling procedures. 3. To avoid injury to operative. |
||||||
ADDITIONAL MEASURES REQUIRED
Review for each task as required throughout the contract. Trainees to be supervised |
ACTION BY
Management, supervisors & operatives. |
BY WHEN
Prior to contract start date and on-going throughout contract. |
|||||
STATEMENT OF RESIDUAL RISKS
When the detailed control measures in place are adhered to, the risks above should be reduced to an acceptable level. |
|||||||
ADDITIONAL REQUIREMENTS FOR VULNERABLE GROUPS
Ensure that physical capabilities are taken into account when allocating works. |
|||||||
MONITORING RESULTS
Monitoring is required to ensure that the control remain effective. |
|||||||
ASSESSOR – NAME
|
POSITION
Director |
REVIEW DATE
01.06.21 |
LAST REVISED
01.06.20 |
||||